Overview
Tokyo Metropolitan Government describes Smart Tokyo as a program for data linkage, connectivity, and digital public services. Its metropolitan scale makes scope discipline essential: a district pilot is not evidence of deployment across Tokyo.
Published city description
Important for mobility, resilience, smart buildings, robotics, and advanced urban services.
Program and scale
Tokyo is an established metropolis with multiple administrative layers. Smart Tokyo is a policy and delivery portfolio rather than one integrated system.
Technology and data
Official materials emphasize networks, data linkage, and digital services across government and urban systems. Access rules, interoperability, and departmental ownership are core operating questions.
Analytics and mobility
Forecasting, geospatial analysis, and computer vision may support transport and service projects, but each use requires a named deployment source and governance record.
Evidence boundary
Admin review should preserve the boundary between metropolitan strategy, ward initiatives, and private district projects, and date all operating claims.
Authoritative published assessment · v0.2.3
Classification · 2B
Type Score 13.75 / 100 · Autonomy Score 9.58 / 100
Research edition 2026-10-10-final-best-evidence-v1 · assessment 2026-10-10.
Eight equally weighted service domains use separate Type and Autonomy maxima. Scores and domain-count gates jointly determine the classification. Source limitations and coverage inferences remain part of this assessment.
Eight-domain decisions
| Domain | Type winner · T · coverage | Autonomy winner · A · coverage | Type / Autonomy points | Evidence and qualification |
|---|---|---|---|---|
| MOB | Yurikamome driverless rail · 2 · Coverage: N (0.65) | Yurikamome driverless rail · 2 · Coverage: N (0.65) | 5.41666667 / 5.41666667 | Yurikamome operator official automated rail service N_geographic_coverage_editorial_review 2026-10-11 source check: Yurikamome operator system page documents automatic train operation, station ATO and central command supervision. N is a functional service-network inference. No general-purpose autonomous-city claim.
|
| ENG | Unknown · ? · Coverage: Unknown — not scored | Unknown · ? · Coverage: Unknown — not scored | 0.00000000 / 0.00000000 | unknown_not_absent retain_original_screening_no_new_qualified_evidence |
| WAT | Unknown · ? · Coverage: Unknown — not scored | Unknown · ? · Coverage: Unknown — not scored | 0.00000000 / 0.00000000 | unknown_not_absent retain_original_screening_no_new_qualified_evidence |
| BLD | Unknown · ? · Coverage: Unknown — not scored | Unknown · ? · Coverage: Unknown — not scored | 0.00000000 / 0.00000000 | unknown_not_absent retain_original_screening_no_new_qualified_evidence |
| SAF | Unknown · ? · Coverage: Unknown — not scored | Unknown · ? · Coverage: Unknown — not scored | 0.00000000 / 0.00000000 | unknown_not_absent retain_original_screening_no_new_qualified_evidence |
| ENV | Unknown · ? · Coverage: Unknown — not scored | Unknown · ? · Coverage: Unknown — not scored | 0.00000000 / 0.00000000 | unknown_not_absent retain_original_screening_no_new_qualified_evidence |
| GOV | Metropolitan AI learning and teacher platform · 2 · Coverage: W (1) | Metropolitan AI learning and teacher platform · 1 · Coverage: W (1) | 8.33333333 / 4.16666667 | included provisional retain_original_screening_no_new_qualified_evidence
|
| HLT | Unknown · ? · Coverage: Unknown — not scored | Unknown · ? · Coverage: Unknown — not scored | 0.00000000 / 0.00000000 | unknown_not_absent retain_original_screening_no_new_qualified_evidence |
Eligible domain counts: T1+ 2; T2+ 2; T3 0; A1+ 2; A2+ 1; A3 0.
Smart technology inventory
Current winners and documented deployment evidence are reconciled below. Earlier screening records labeled Unclear do not establish deployment and do not contribute to scores.
| Technology / catalog reference | Domain | Status · coverage | Evidence and limitations |
|---|---|---|---|
| Yurikamome driverless railYurikamome driverless rail | MOB | Deployed / operational · N | Yurikamome operator official automated rail service N_geographic_coverage_editorial_review 2026-10-11 source check: Yurikamome operator system page documents automatic train operation, station ATO and central command supervision. N is a functional service-network inference. No general-purpose autonomous-city claim. Recorded operating deployment · Best-evidence inference / additional verification required
|
| Metropolitan AI learning and teacher platformTECH-TOK-001 | GOV | Deployed / operational · W | included provisional retain_original_screening_no_new_qualified_evidence Recorded operating deployment
|
| Tokyo metropolitan digital citizen appSCD-TP-051 | GOV | Unclear · 1 | Earlier screening evidence; not independently final-verified. Digital administrative portal; same GOV maximum Unverified, excluded, pilot, or unclear technology — not an established scoring deployment · Best-evidence inference / additional verification required · Historical evidence carried forward
|
| AI predictive signal controlSCD-TP-005 | MOB | Unclear · 0.35 | Earlier screening evidence; not independently final-verified. Tokyo Police states validation work towards automatic adjustments; no production C credit Unverified, excluded, pilot, or unclear technology — not an established scoring deployment · Best-evidence inference / additional verification required · Historical evidence carried forward
|
| Smart water meter large rolloutSCD-TP-022 | WAT | Unclear · 0.35 | Earlier screening evidence; not independently final-verified. Planned deployment not equivalent completed meter coverage Unverified, excluded, pilot, or unclear technology — not an established scoring deployment · Best-evidence inference / additional verification required · Historical evidence carried forward
|
| AI storm surge forecast and flood barriersSCD-TP-041 | SAF | Unclear · 0.35 | Earlier screening evidence; not independently final-verified. Strategy main FY2026 initiatives; operating status not adequately corroborated Unverified, excluded, pilot, or unclear technology — not an established scoring deployment · Best-evidence inference / additional verification required · Historical evidence carried forward
|
68-pattern research audit · unknown does not mean absent
Original stage labels are preserved. Unverified patterns are research audit entries, not deployments.
[
{
"city": "Tokyo",
"pattern_id": "SCD-TP-001",
"catalog_technology": "Connected smartcard fare validators",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-002",
"catalog_technology": "Biometric Metro fare access",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|9|11|12",
"catalog_T_reference": "2",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-003",
"catalog_technology": "Connected transit vehicle location telemetry",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-004",
"catalog_technology": "AI transit-dispatch recommendations",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-005",
"catalog_technology": "Adaptive network traffic-signal optimization",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|8|11|14|17|18",
"catalog_T_reference": "2",
"catalog_A_reference": "2",
"screening_status": "documented_excluded_or_pending",
"linked_technology_ids": "TECH-TOK-003",
"operational_statuses": "development/test",
"audit_note": "Tokyo Police states validation work towards automatic adjustments; no production C credit",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-006",
"catalog_technology": "Fixed-rule bus transit-signal priority",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|9|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-007",
"catalog_technology": "Fully automatic driverless metro operation",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|8|11|17|18",
"catalog_T_reference": "2",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-008",
"catalog_technology": "Autonomous ground delivery robots",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|8|11|12|16|18",
"catalog_T_reference": "3",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-009",
"catalog_technology": "Robotaxi autonomous road service",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|8|12|16|18|19",
"catalog_T_reference": "3",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-010",
"catalog_technology": "Connected parking occupancy guidance",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-011",
"catalog_technology": "Predictive municipal fleet maintenance",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-012",
"catalog_technology": "Congestion forecasting and advisory dashboard",
"primary_scoring_domain": "MOB",
"canonical_21_domain_ids": "1|11|12|13",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-013",
"catalog_technology": "Electricity advanced metering infrastructure",
"primary_scoring_domain": "ENG",
"canonical_21_domain_ids": "2|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-014",
"catalog_technology": "Grid SCADA monitoring and alarm center",
"primary_scoring_domain": "ENG",
"canonical_21_domain_ids": "2|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-015",
"catalog_technology": "Fixed-protection automatic feeder reclosers",
"primary_scoring_domain": "ENG",
"canonical_21_domain_ids": "2|8|9|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-016",
"catalog_technology": "Self-healing distribution reconfiguration (FLISR)",
"primary_scoring_domain": "ENG",
"canonical_21_domain_ids": "2|11|14|17|18",
"catalog_T_reference": "2",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-017",
"catalog_technology": "AI short-term load forecasting advisory",
"primary_scoring_domain": "ENG",
"canonical_21_domain_ids": "2|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-018",
"catalog_technology": "Autonomous DER portfolio dispatch",
"primary_scoring_domain": "ENG",
"canonical_21_domain_ids": "2|10|11|14|17|18",
"catalog_T_reference": "2",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-019",
"catalog_technology": "Preset microgrid islanding protection",
"primary_scoring_domain": "ENG",
"canonical_21_domain_ids": "2|8|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-020",
"catalog_technology": "Goal-directed microgrid energy optimizer",
"primary_scoring_domain": "ENG",
"canonical_21_domain_ids": "2|14|16|17|18|19",
"catalog_T_reference": "3",
"catalog_A_reference": "3",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-021",
"catalog_technology": "Fixed-rule automated demand response",
"primary_scoring_domain": "ENG",
"canonical_21_domain_ids": "2|9|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-022",
"catalog_technology": "Connected household smart water meters",
"primary_scoring_domain": "WAT",
"canonical_21_domain_ids": "3|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "documented_excluded_or_pending",
"linked_technology_ids": "TECH-TOK-004",
"operational_statuses": "planned rollout",
"audit_note": "Planned deployment not equivalent completed meter coverage",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-023",
"catalog_technology": "Acoustic water network leakage telemetry",
"primary_scoring_domain": "WAT",
"canonical_21_domain_ids": "3|8|9",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-024",
"catalog_technology": "AI leak localization with human dispatch",
"primary_scoring_domain": "WAT",
"canonical_21_domain_ids": "3|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-025",
"catalog_technology": "Conventional pumping/pressure SCADA control",
"primary_scoring_domain": "WAT",
"canonical_21_domain_ids": "3|8|11|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-026",
"catalog_technology": "Autonomous network pressure optimization",
"primary_scoring_domain": "WAT",
"canonical_21_domain_ids": "3|13|14|17|18",
"catalog_T_reference": "2",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-027",
"catalog_technology": "Conventional automatic treatment chemical dosing",
"primary_scoring_domain": "WAT",
"canonical_21_domain_ids": "3|8|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-028",
"catalog_technology": "AI drinking-water treatment adviser",
"primary_scoring_domain": "WAT",
"canonical_21_domain_ids": "3|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-029",
"catalog_technology": "Autonomous wastewater process optimization",
"primary_scoring_domain": "WAT",
"canonical_21_domain_ids": "3|11|14|17|18",
"catalog_T_reference": "2",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-030",
"catalog_technology": "Fixed schedule municipal streetlights",
"primary_scoring_domain": "BLD",
"canonical_21_domain_ids": "4|17",
"catalog_T_reference": "0",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-031",
"catalog_technology": "Connected streetlight fault monitoring",
"primary_scoring_domain": "BLD",
"canonical_21_domain_ids": "4|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-032",
"catalog_technology": "Ambient-sensor streetlight dimming",
"primary_scoring_domain": "BLD",
"canonical_21_domain_ids": "4|8|9|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-033",
"catalog_technology": "Adaptive urban lighting strategy optimizer",
"primary_scoring_domain": "BLD",
"canonical_21_domain_ids": "4|8|14|17|18",
"catalog_T_reference": "2",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-034",
"catalog_technology": "Connected conventional building management systems",
"primary_scoring_domain": "BLD",
"canonical_21_domain_ids": "4|8|9|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-035",
"catalog_technology": "AI building energy management adviser",
"primary_scoring_domain": "BLD",
"canonical_21_domain_ids": "4|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-036",
"catalog_technology": "District-scale autonomous HVAC optimizer",
"primary_scoring_domain": "BLD",
"canonical_21_domain_ids": "4|10|13|14|17|18",
"catalog_T_reference": "2",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-037",
"catalog_technology": "Bridge/structural health IoT monitoring",
"primary_scoring_domain": "BLD",
"canonical_21_domain_ids": "4|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-038",
"catalog_technology": "Police facial-watchlist identification alerts",
"primary_scoring_domain": "SAF",
"canonical_21_domain_ids": "5|11|12|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-039",
"catalog_technology": "Integrated situational-awareness camera feeds",
"primary_scoring_domain": "SAF",
"canonical_21_domain_ids": "5|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-040",
"catalog_technology": "AI acoustic gunshot classification alerts",
"primary_scoring_domain": "SAF",
"canonical_21_domain_ids": "5|8|12|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-041",
"catalog_technology": "Predictive flood warning decision support",
"primary_scoring_domain": "SAF",
"canonical_21_domain_ids": "5|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "documented_excluded_or_pending",
"linked_technology_ids": "TECH-TOK-005",
"operational_statuses": "roadmap/proposed",
"audit_note": "Strategy main FY2026 initiatives; operating status not adequately corroborated",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-042",
"catalog_technology": "AI emergency resource dispatch recommendations",
"primary_scoring_domain": "SAF",
"canonical_21_domain_ids": "5|12|14|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-043",
"catalog_technology": "Autonomous flood barrier and sluice coordination",
"primary_scoring_domain": "SAF",
"canonical_21_domain_ids": "5|8|14|17|18",
"catalog_T_reference": "2",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-044",
"catalog_technology": "Autonomous emergency inspection drones",
"primary_scoring_domain": "SAF",
"canonical_21_domain_ids": "5|8|12|16|18",
"catalog_T_reference": "3",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-045",
"catalog_technology": "Continuous municipal air-quality sensor network",
"primary_scoring_domain": "ENV",
"canonical_21_domain_ids": "6|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-046",
"catalog_technology": "Connected urban noise monitoring",
"primary_scoring_domain": "ENV",
"canonical_21_domain_ids": "6|8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-047",
"catalog_technology": "Smart-bin waste-fill telemetry",
"primary_scoring_domain": "ENV",
"canonical_21_domain_ids": "6|8|9",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-048",
"catalog_technology": "Timed pneumatic municipal waste collection",
"primary_scoring_domain": "ENV",
"canonical_21_domain_ids": "6|9|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-049",
"catalog_technology": "Autonomous robotic waste sorting",
"primary_scoring_domain": "ENV",
"canonical_21_domain_ids": "6|12|16|17|18",
"catalog_T_reference": "3",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-050",
"catalog_technology": "AI waste-fleet route planning advisory",
"primary_scoring_domain": "ENV",
"canonical_21_domain_ids": "6|12|13|14|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-051",
"catalog_technology": "Online municipal service transaction portal",
"primary_scoring_domain": "GOV",
"canonical_21_domain_ids": "7|9",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "operating_candidate",
"linked_technology_ids": "TECH-TOK-002",
"operational_statuses": "operating production",
"audit_note": "Digital administrative portal; same GOV maximum",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-052",
"catalog_technology": "Generative-AI city information chatbot",
"primary_scoring_domain": "GOV",
"canonical_21_domain_ids": "7|9|12|19",
"catalog_T_reference": "2",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-053",
"catalog_technology": "AI citizen-case prioritization adviser",
"primary_scoring_domain": "GOV",
"canonical_21_domain_ids": "7|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-054",
"catalog_technology": "Urban digital twin for planning decisions",
"primary_scoring_domain": "GOV",
"canonical_21_domain_ids": "10|12|13|15|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-055",
"catalog_technology": "AI-supported municipal procurement risk review",
"primary_scoring_domain": "GOV",
"canonical_21_domain_ids": "7|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-056",
"catalog_technology": "Connected remote patient monitoring",
"primary_scoring_domain": "HLT",
"canonical_21_domain_ids": "8|9|11|19",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-057",
"catalog_technology": "Connected ambulance location and status",
"primary_scoring_domain": "HLT",
"canonical_21_domain_ids": "8|9|11",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-058",
"catalog_technology": "AI clinical decision-support recommender",
"primary_scoring_domain": "HLT",
"canonical_21_domain_ids": "12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-059",
"catalog_technology": "Fixed-rule automated medication dispensing",
"primary_scoring_domain": "HLT",
"canonical_21_domain_ids": "9|17",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-060",
"catalog_technology": "Autonomous hospital logistics robot fleet",
"primary_scoring_domain": "HLT",
"canonical_21_domain_ids": "8|12|16|18",
"catalog_T_reference": "3",
"catalog_A_reference": "2",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-061",
"catalog_technology": "Unified government-service portal with cross-agency transactions",
"primary_scoring_domain": "GOV",
"canonical_21_domain_ids": "7|9|10|19",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-062",
"catalog_technology": "Integrated digital identity and government data exchange",
"primary_scoring_domain": "GOV",
"canonical_21_domain_ids": "7|9|10|19",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-063",
"catalog_technology": "AI-assisted government eligibility and case assessment",
"primary_scoring_domain": "GOV",
"canonical_21_domain_ids": "7|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-064",
"catalog_technology": "Integrated electronic health records and patient-service platform",
"primary_scoring_domain": "HLT",
"canonical_21_domain_ids": "9|10|19",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-065",
"catalog_technology": "AI clinical triage with clinician approval",
"primary_scoring_domain": "HLT",
"canonical_21_domain_ids": "12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-066",
"catalog_technology": "Citywide school learning and administration platform",
"primary_scoring_domain": "GOV*",
"canonical_21_domain_ids": "7|9|10",
"catalog_T_reference": "1",
"catalog_A_reference": "0",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-067",
"catalog_technology": "AI-assisted personalized education and teacher decision support",
"primary_scoring_domain": "GOV*",
"canonical_21_domain_ids": "7|12|13|19",
"catalog_T_reference": "2",
"catalog_A_reference": "1",
"screening_status": "operating_candidate",
"linked_technology_ids": "TECH-TOK-001",
"operational_statuses": "operating production",
"audit_note": "256 metropolitan schools across whole education administrative network; GOV* scoring crosswalk",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
},
{
"city": "Tokyo",
"pattern_id": "SCD-TP-068",
"catalog_technology": "Integrated cognitive city digital twin / cross-domain autonomous city operations",
"primary_scoring_domain": "GOV",
"canonical_21_domain_ids": "8|10|11|12|13|14|15|17|18|19",
"catalog_T_reference": "3",
"catalog_A_reference": "3",
"screening_status": "not_verified_in_limited_source_review",
"linked_technology_ids": "",
"operational_statuses": "",
"audit_note": "No matched credible claim in this first-pass shortlist. UNKNOWN; not confirmed absent.",
"scope": "First-pass shortlist only; Sites city URL corpus not supplied"
}
]Sources and evidence
Each canonical publication URL appears once in this group. Reference aliases and research stages do not count as independent corroboration.
- Yurikamome Operator ↗
Operating driverless elevated railway Tokyo, ~15km 16 stations
Original source examined in the recorded research stage
Evidence IDs, provenance and review states (1)
- RE13-022 · final14 · prior_targeted_original_opened
- Yurikamome Operator ↗
Operator explains computer automatic train operation
Original source examined in the recorded research stage
Evidence IDs, provenance and review states (1)
- RE13-023 · final14 · prior_targeted_original_opened
- Tokyo Metropolitan Government ↗
Strategy records implemented AI education and numerous proposed 2026 initiatives, not proof of every deployment
Original source examined in the recorded research stage
Evidence IDs, provenance and review states (1)
- SRC-TOK-001 · final14 · previous_screening_examined
- Tokyo Metropolitan Government - Education ↗
AI learning environment established all 256 metropolitan schools May 2025
Original source examined in the recorded research stage
Evidence IDs, provenance and review states (1)
- SRC-TOK-002 · final14 · previous_screening_examined
- Tokyo Metropolitan Government ↗
Tokyo App operating portal, scope across metropolis
Original source examined in the recorded research stage
Evidence IDs, provenance and review states (1)
- SRC-TOK-005 · final14 · previous_screening_examined_earlier
- Tokyo Metropolitan Government - Police ↗
AI automatic adaptive signal decision project in validation stage, not verified production
Original source examined in the recorded research stage
Evidence IDs, provenance and review states (1)
- SRC-TOK-003 · final14 · previous_screening_examined
- Tokyo Metropolitan Waterworks ↗
Smart water meter future rollout, exclude incomplete installations
One million smart meters FY2025-28 plan; full 2030s roll out; not operating W now
Original source examined in the recorded research stage · Search-excerpt or index-only evidence
Evidence IDs, provenance and review states (2)
- SRC-TOK-004 · final14 · previous_screening_examined_earlier
- RE13-024 · final14 · prior_targeted_search_excerpt_only
Tokyo research report
Tokyo is classified 2B with Type Score 13.75 and Autonomy Score 9.58, under v0.2.3. The eight-domain decisions, deployment inventory and source review states above form this edition's reproducible assessment.
Limitations
- MOB: Yurikamome operator official automated rail service N_geographic_coverage_editorial_review
- GOV: included provisional retain_original_screening_no_new_qualified_evidence
Supplied research report archive · original wording preserved
# SCD — Seven-City Final Best-Evidence Research Edition (2026-10-10) **Methodology:** Approved quantitative v0.2.3 (unchanged weights, thresholds, eight buckets, coefficients, and 68-pattern taxonomy). **Research standing:** FINAL FOR THIS DATED EDITION by editor-authorized best-evidence judgment, not a claim of exhaustive proof or permanence. **Site status:** Not imported, not published. No live SCD records or user-facing city pages changed. **Limitations:** Full SCD Sites source exports were not supplied; the preceding 68×7 screening was bounded and the later seven-city re-audit targeted. The figures represent evaluated evidence and justified assumptions, not objective full-universe technology prevalence. ## Decision table | City | Type raw / displayed | Autonomy raw / displayed | Final classification | T2 domains | C domains | |---|---:|---:|---|---:|---:| | Amsterdam | 13.54166667 / **13.54** | 5.41666667 / **5.42** | **2B** | 2 | 0 | | London | 22.08333333 / **22.08** | 12.50000000 / **12.50** | **2B** | 2 | 1 | | Shanghai | 17.91666667 / **17.92** | 11.04166667 / **11.04** | **2B** | 2 | 1 | | Dubai | 26.25000000 / **26.25** | 16.45833333 / **16.46** | **2C** | 3 | 2 | | Seoul | 19.16666667 / **19.17** | 12.29166667 / **12.29** | **2B** | 3 | 1 | | Tokyo | 13.75000000 / **13.75** | 9.58333333 / **9.58** | **2B** | 2 | 1 | | Helsinki | 23.54166667 / **23.54** | 8.33333333 / **8.33** | **2B** | 2 | 0 | Raw domain values are calculated using 100 × 0.125 × g × c × T/3 and its autonomy analogue, with separate maxima for each domain. Display to two decimals using ROUND_HALF_UP. Zero for an unverified domain means **no accepted positive contribution**, not a finding that the city lacks the capability. ## Dubai editorial decision and reversal gate Dubai **2C, 26.25 / 16.46** is an explicitly documented **best-evidence inference**, not the result of a privately obtained SCADA specification. The 2025 DEWA Smart Grid Report (pp. 13–14) confirms implemented FLISR including ASGR in production distribution operations. DEWA 2024 and 2026 releases independently across time describe round-the-clock automatic isolation/restoration without human intervention. FLISR linked to network state-estimation/flow supports a reasonable operational contextual-control interpretation, rather than equating simple fault relay trips with C. The system is assumed materially city-serving N (`c=.65`) even though exact commissioned feeder coverage is not published. This is a research-judgment eligibility assignment under the editor's best-guess authorization; it **is not externally verified N-scope**. If a later operational audit shows ASGR operates only in isolated pilot feeders, or its operating logic cannot select context-dependent restoration actions, downgrade Energy from C to B and record a new revision: **Dubai 26.25 / 15.21 — 2B**. A sufficiently documented W-scale FLISR can instead support **26.25 / 19.38 — 2C**. This ambiguity is stated openly rather than hidden in the numeric result. Primary DEWA evidence: - [2025 Smart Grid Report, FLISR/ASGR implemented, PDF p.14](https://www.dewa.gov.ae/-/media/Files/smartgrid/Smart-Grid_Report_2025_EN_Final.ashx) - [2024 operator report on automatic restoration without intervention](https://www.dewa.gov.ae/en/about-us/media-publications/latest-news/2024/12/electricity-and-water-smart-grid-supports) - [2026 operator account of uninterrupted automated feeder restoration](https://dewa.gov.ae/en/about-us/media-publications/latest-news/2026/7/dewa-provides-a-practical-model) - [2022 Hydronet water AI as non-C-confirmed context](https://dewa.gov.ae/en/about-us/media-publications/latest-news/2022/07/dewa-uses-ai-to-improve-the-efficiency-of-the-water-network) ## City-by-city decision, exclusions, and next-higher tests ### Amsterdam — 2B (13.54 / 5.42) **Included evidence and rationale.** Production municipality algorithm services in Buildings and Digital Government, plus multi-site environmental monitoring. The discontinued intelligent traffic-signal system receives no credit. **Remaining uncertainty / excluded evidence.** Borough penetration of object-recognition and municipal planning AI is inferred at material-service-network scale; no presently qualifying Mobility C identified. Other undocumented systems remain unknown, not absent. **Why not the next class.** Type 3 would require ≥30 and three distinct qualifying T3 service domains; neither is supported. Level C requires ≥10 autonomy points **and** two distinct independently acting C domains; that breadth is not shown. The autonomy score is also below 10. **Change trigger for next edition.** New verified service-network mobility control, urban utilities, or an independently operating second Type 2 domain could increase scores. **Domain calculations.** | Domain | T winner | T scale, score | A winner | A scale, score | |---|---|---:|---|---:| | MOB | unknown | —, 0.00 | unknown | —, 0.00 | | ENG | unknown | —, 0.00 | unknown | —, 0.00 | | WAT | unknown | —, 0.00 | unknown | —, 0.00 | | BLD | TECH-AMS-001 | N, 5.42 | TECH-AMS-001 | N, 2.71 | | SAF | unknown | —, 0.00 | unknown | —, 0.00 | | ENV | TECH-AMS-003 | N, 2.71 | unknown | —, 0.00 | | GOV | TECH-AMS-002 | N, 5.42 | TECH-AMS-002 | N, 2.71 | | HLT | unknown | —, 0.00 | unknown | —, 0.00 | ### London — 2B (22.08 / 12.50) **Included evidence and rationale.** TfL SCOOT adaptive traffic control is treated as broad operating control; DLR provides independent confirmation of operational mobility autonomy but cannot count in a second domain. Planning London Datahub, connected water meters and air monitors add Type coverage. **Remaining uncertainty / excluded evidence.** Broad city-service coverage of deployed SCOOT is an editorial interpretation drawn from historical network counts and operating control descriptions, not a current borough-by-borough census; no second Level C domain. **Why not the next class.** Type 3 would require ≥30 and three distinct qualifying T3 service domains; neither is supported. Level C requires ≥10 autonomy points **and** two distinct independently acting C domains; that breadth is not shown. The autonomy score clears 10 but breadth does not. **Change trigger for next edition.** Current SCOOT coverage inventory would adjust Mobility points. DLR-only sensitivity gives 19.17 / 9.58 without changing 2B. **Domain calculations.** | Domain | T winner | T scale, score | A winner | A scale, score | |---|---|---:|---|---:| | MOB | SCOOT traffic-signal optimization across London | W, 8.33 | SCOOT traffic-signal optimization across London | W, 8.33 | | ENG | unknown | —, 0.00 | unknown | —, 0.00 | | WAT | TECH-LON-004 | N, 2.71 | unknown | —, 0.00 | | BLD | unknown | —, 0.00 | unknown | —, 0.00 | | SAF | unknown | —, 0.00 | unknown | —, 0.00 | | ENV | TECH-LON-005 | N, 2.71 | unknown | —, 0.00 | | GOV | TECH-LON-003 | W, 8.33 | TECH-LON-003 | W, 4.17 | | HLT | unknown | —, 0.00 | unknown | —, 0.00 | ### Shanghai — 2B (17.92 / 11.04) **Included evidence and rationale.** Multiple operating GoA4 automated metro lines support Mobility Level C; operational power-network analytics and digital-government platforms support Type 2. **Remaining uncertainty / excluded evidence.** Localized electrical self-healing installations do not establish material city-serving Level C Energy deployment; citywide water control remains unverified. **Why not the next class.** Type 3 would require ≥30 and three distinct qualifying T3 service domains; neither is supported. Level C requires ≥10 autonomy points **and** two distinct independently acting C domains; that breadth is not shown. The autonomy score clears 10 but breadth does not. **Change trigger for next edition.** Verified city-serving electricity/water autonomous actuation would create a candidate second Level C domain. **Domain calculations.** | Domain | T winner | T scale, score | A winner | A scale, score | |---|---|---:|---|---:| | MOB | TECH-SHA-001 | W, 8.33 | TECH-SHA-001 | W, 8.33 | | ENG | TECH-SHA-003 | N, 5.42 | TECH-SHA-003 | N, 2.71 | | WAT | unknown | —, 0.00 | unknown | —, 0.00 | | BLD | unknown | —, 0.00 | unknown | —, 0.00 | | SAF | unknown | —, 0.00 | unknown | —, 0.00 | | ENV | unknown | —, 0.00 | unknown | —, 0.00 | | GOV | TECH-SHA-004 | W, 4.17 | unknown | —, 0.00 | | HLT | unknown | —, 0.00 | unknown | —, 0.00 | ### Dubai — 2C (26.25 / 16.46) **Included evidence and rationale.** Operating driverless Dubai Metro provides Mobility C. DEWA's implemented FLISR/ASGR identifies/isolates electrical faults and restores customers automatically without routine human intervention. Best-evidence editorial judgment assigns N-scale contextual Energy C. Hydronet is retained as Water Type 2/B. **Remaining uncertainty / excluded evidence.** The exact share of DEWA feeders under ASGR and full restoration action-selection logic are not published. Material-network N scale and adaptive strategy choice are explicit editorial inferences, not independently verified engineering specifications. **Why not the next class.** Type 3 would require ≥30 and three distinct qualifying T3 service domains; neither is supported. Level D would require ≥30 and three distinct A3 domains, neither is met. **Change trigger for next edition.** If ASGR fails the N-scale or contextual decision-selection test, revert to 26.25 / 15.21 and 2B; if W-scale is verified, A could reach 19.38 (2C). **Domain calculations.** | Domain | T winner | T scale, score | A winner | A scale, score | |---|---|---:|---|---:| | MOB | TECH-DUB-001 | W, 8.33 | TECH-DUB-001 | W, 8.33 | | ENG | TECH-DUB-002 | W, 8.33 | DEWA ASGR/FLISR feeder reconfiguration | N, 5.42 | | WAT | TECH-DUB-003 | N, 5.42 | TECH-DUB-003 | N, 2.71 | | BLD | unknown | —, 0.00 | unknown | —, 0.00 | | SAF | unknown | —, 0.00 | unknown | —, 0.00 | | ENV | unknown | —, 0.00 | unknown | —, 0.00 | | GOV | TECH-DUB-004 | W, 4.17 | unknown | —, 0.00 | | HLT | unknown | —, 0.00 | unknown | —, 0.00 | ### Seoul — 2B (19.17 / 12.29) **Included evidence and rationale.** Ui-Sinseol and Sillim are operating driverless urban-rail networks; production intelligent CCTV and S-Map support Public Safety and Digital Government Type 2. **Remaining uncertainty / excluded evidence.** Driverless rail N-scale is based on functional service significance, not area percentage. Advanced water-control references are pilot or insufficiently localized; no second C domain. **Why not the next class.** Type 3 would require ≥30 and three distinct qualifying T3 service domains; neither is supported. Level C requires ≥10 autonomy points **and** two distinct independently acting C domains; that breadth is not shown. The autonomy score clears 10 but breadth does not. **Change trigger for next edition.** Corroborated operating production Water/Energy autonomous controls would change the autonomy level if breadth and score gates pass. **Domain calculations.** | Domain | T winner | T scale, score | A winner | A scale, score | |---|---|---:|---|---:| | MOB | Ui-Sinseol and Sillim driverless rail operations | N, 5.42 | Ui-Sinseol and Sillim driverless rail operations | N, 5.42 | | ENG | unknown | —, 0.00 | unknown | —, 0.00 | | WAT | unknown | —, 0.00 | unknown | —, 0.00 | | BLD | unknown | —, 0.00 | unknown | —, 0.00 | | SAF | TECH-SEO-002 | N, 5.42 | TECH-SEO-002 | N, 2.71 | | ENV | unknown | —, 0.00 | unknown | —, 0.00 | | GOV | TECH-SEO-001 | W, 8.33 | TECH-SEO-001 | W, 4.17 | | HLT | unknown | —, 0.00 | unknown | —, 0.00 | ### Tokyo — 2B (13.75 / 9.58) **Included evidence and rationale.** Yurikamome is an operating automated passenger rail network. Operating Tokyo-wide education AI platform is counted in GOV, the agreed temporary crosswalk. **Remaining uncertainty / excluded evidence.** Yurikamome N-scale is functionally material despite limited service area. Education GOV classification is the frozen crosswalk, and several Smart Tokyo technologies are only proposed or rolling out. **Why not the next class.** Type 3 would require ≥30 and three distinct qualifying T3 service domains; neither is supported. Level C requires ≥10 autonomy points **and** two distinct independently acting C domains; that breadth is not shown. The autonomy score is also below 10. **Change trigger for next edition.** Broader operating mature infrastructure and healthcare deployments would likely raise the evidence score. **Domain calculations.** | Domain | T winner | T scale, score | A winner | A scale, score | |---|---|---:|---|---:| | MOB | Yurikamome driverless rail | N, 5.42 | Yurikamome driverless rail | N, 5.42 | | ENG | unknown | —, 0.00 | unknown | —, 0.00 | | WAT | unknown | —, 0.00 | unknown | —, 0.00 | | BLD | unknown | —, 0.00 | unknown | —, 0.00 | | SAF | unknown | —, 0.00 | unknown | —, 0.00 | | ENV | unknown | —, 0.00 | unknown | —, 0.00 | | GOV | TECH-TOK-001 | W, 8.33 | TECH-TOK-001 | W, 4.17 | | HLT | unknown | —, 0.00 | unknown | —, 0.00 | ### Helsinki — 2B (23.54 / 8.33) **Included evidence and rationale.** Helen’s live district-heating digital twin materially serves a network supplying roughly 90% of Helsinki; GOV city modeling and HLT digital health contribute further Type score. **Remaining uncertainty / excluded evidence.** W-scale digital-twin coverage is vendor-backed and operator corroboration is limited. Automation remains decision-support B because autonomous execution of heat dispatch was not demonstrated. **Why not the next class.** Type 3 would require ≥30 and three distinct qualifying T3 service domains; neither is supported. Level C requires ≥10 autonomy points **and** two distinct independently acting C domains; that breadth is not shown. The autonomy score is also below 10. **Change trigger for next edition.** Verified operating energy-dispatch autonomy or second autonomous domain could change autonomy score and label. **Domain calculations.** | Domain | T winner | T scale, score | A winner | A scale, score | |---|---|---:|---|---:| | MOB | TECH-HEL-003 | N, 2.71 | unknown | —, 0.00 | | ENG | Helen district-heating real-time digital twin | W, 8.33 | Helen district-heating real-time digital twin | W, 4.17 | | WAT | unknown | —, 0.00 | unknown | —, 0.00 | | BLD | unknown | —, 0.00 | unknown | —, 0.00 | | SAF | unknown | —, 0.00 | unknown | —, 0.00 | | ENV | unknown | —, 0.00 | unknown | —, 0.00 | | GOV | TECH-HEL-001 | W, 8.33 | TECH-HEL-001 | W, 4.17 | | HLT | TECH-HEL-002 | W, 4.17 | unknown | —, 0.00 | ## Research completeness and source provenance The baseline source register has **39 recorded candidate URLs** (22 marked examined at initial screening, eight examined earlier, three inaccessible, six with no full original examination); the subsequent targeted re-audit has **28 referenced URLs**, including 11 marked original pages opened at some point in the prior audit, 13 search-excerpt-only references, and four other/not-confirmed references. These are **separate batches, not additive source totals**, because the URL lists overlap. In the present completion step, **five DEWA original publications were opened** (the 2025 Smart Grid PDF, June 2026 update, and 2024, July 2026 and July 2022 releases), of which three are new exact URLs relative to the preceding registers. The appended source register preserves access statuses. Source counts are provenance-limited; they do not imply a comprehensive audit of all Sites-held sources. ### City source-register tally (distinct city-URL keys; some review statuses are inherited from earlier work) | City | Unique URLs recorded | Opened/examined in some pass | URLs accepted in at least one earlier pass | Inaccessible/unconfirmed | No full original examination recorded | |---|---:|---:|---:|---:|---:| | Amsterdam | 7 | 5 | 3 | 0 | 2 | | London | 10 | 7 | 9 | 0 | 3 | | Shanghai | 9 | 3 | 1 | 2 | 6 | | Dubai | 14 | 9 | 9 | 2 | 5 | | Seoul | 10 | 6 | 5 | 0 | 4 | | Tokyo | 8 | 7 | 5 | 0 | 1 | | Helsinki | 8 | 6 | 5 | 0 | 2 | Counts of accepted and examined are not disjoint. The source register also contains rejected/limited sources with exclusion reasons; duplicate URLs are retained as provenance records, while the table de-duplicates by city and URL. The previous targeted register recorded 16 distinct publisher organizations; because combined publisher labels are not normalized, no inflated all-pass publisher count is claimed. ## Change-control rules 1. This dated decision **closes** the seven-city research edition. Do not silently change these figures or reuse the word “provisional” for this fixed edition. Unknowns and assumptions remain disclosed. 2. Any material new evidence opens a new dated city research revision; retain this version and compare domain-level score deltas, new scores, label, sources and methodology version. 3. A full SCD source-URL export can improve future versions; its absence does not reopen this edition automatically. 4. This archive is **research data, not a Sites import/package or publication authorization**. Before any production action, match actual database city IDs, validate site importer implementation and get a separate explicit publishing instruction. 5. Neither Type and Autonomy scores nor the classification labels are changed for any older calibration city; Singapore 2B, Moscow 2B and other approved historical regression fixtures stay preserved.
Technology record
Related city profiles
Sources (37)
- 01Tokyo Metropolitan Government — Smart Tokyo ↗
- 02Tokyo Metropolitan Government — Smart Tokyo ↗
- 03Smart Tokyo — data integration and projects ↗
- 04Tokyo Metropolitan Government — open data catalog ↗
- 05Tokyo Metropolitan Government — digital strategy ↗
- 06Tokyo Metropolitan Government — public policy dashboard ↗
- 07Brave Web Search: The Worldfolio: Tokyo Metro Expands Beyond Railways Through Smart City Infrastructure, Urban Development and Global Operations Expertise ↗
- 08Brave Web Search: Digital Twins in Tokyo, Japan | THE FUTURE 3D ↗
- 09Brave Web Search: Tokyo’s Smart City Vision Puts Sustainability at the Centre of Urban Reinvention - Carbonwire.org ↗
- 10Brave Web Search: Tokyo Pavilion at 2026 SCSE: Building Resilient Tokyo with Digital Twin -TMG ↗
- 11Brave Web Search: Tokyo Smart City Technology 2026: AI, IoT & Sustainability in Luxury Buildings | Tokyo Luxury Towers | Tokyo Luxury Towers ↗
- 12Brave Web Search: Japan Digital Twin Platforms for Smart Cities Market Share, Companies & Trends Report 2025-2031 ↗
- 13Brave Web Search: Driving Change with AI: Tokyo’s Strategic Approach -TMG ↗
- 14Brave Web Search: Smart Tokyo Implementation Strategy -TMG ↗
- 15Brave Web Search: Japan's Smart Cities: Piezoelectric Sidewalks and IoT ↗
- 16Brave Web Search: Tokyo Smart City Technology 2025: IoT & AI in Luxury Buildings | Tokyo Luxury Towers | Tokyo Luxury Towers ↗
- 17Brave Web Search: Tokyo AI Strategy -TMG ↗
- 18Brave Web Search: Digital Twin: A New Solution for Urban Challenges in Tokyo -TMG ↗
- 19Brave Web Search: AI-Powered Vending Machines In Tokyo: Transforming Urban Retail Across Japan And Asia-Pacific With Smart, Data-Driven Solutions ↗
- 20Brave Web Search: Future of the Japan Robo Taxi Industry | Key Trends and Market Insights ↗
- 21Brave Web Search: Tokyo Digital Twin case study | Smart city platform with TerriaJS | Terria ↗
- 22Brave Web Search: Digital twins, increasingly utilized in smart cities. What possibilities does this technology—recreating the real world digitally—hold for business? ↗
- 23Brave Web Search · followed link: Smart City Takeshiba – Smart City Tokyo ↗
- 24Brave Web Search · followed link: Bureau of Digital Services-TMG ↗
- 25Brave Web Search · followed link: SMARTCITY × TOKYO -2024 AUTUMN MEETING- - イベント - スマートシティ東京 ↗
- 26Brave Web Search · followed link: 【Disaster Response】Smart City Tokyo Bay Takeshiba ↗
- 27Brave Web Search · followed link: ドローンの利活用拡大を目指した取組の推進|スマートシティ|東京都デジタルサービス局 ↗
- 28Brave Web Search · followed link: Smart Tokyo Implementation Strategy 2025-2026 -TMG ↗
- 29Brave Web Search · followed link: Tokyo Accelerates International Partnerships in Digital and AI Fields -TMG ↗
- 30Brave Web Search · followed link: Tokyo AI Adoption and Use Guidelines: A Framework for the Future of Administrative Services -TMG ↗
- 31Yurikamome Operator · RE13-022 (prior_targeted_original_opened) ↗
- 32Yurikamome Operator · RE13-023 (prior_targeted_original_opened) ↗
- 33Tokyo Metropolitan Government · SRC-TOK-001 (previous_screening_examined) ↗
- 34Tokyo Metropolitan Government - Education · SRC-TOK-002 (previous_screening_examined) ↗
- 35Tokyo Metropolitan Government · SRC-TOK-005 (previous_screening_examined_earlier) ↗
- 36Tokyo Metropolitan Government - Police · SRC-TOK-003 (previous_screening_examined) ↗
- 37Tokyo Metropolitan Bureau of Waterworks · RE13-024 (prior_targeted_search_excerpt_only) ↗
How SCD classifies cities
Review the classification methodology, see the calculation method, or classify a city.